MAIN FEATHER

Design of high production and long distance.Reliability design, Easy control, Simple maintenance.

Heavy duty Cummins/Cat Engine.
Australian technology Pump.
Electric system and hydraulic system all equipped from famous European Brand.
Engine room big and cool easily maintenance. Dredge can be equipped with several options such as
Anchor Booms, Spud Carriers, Pump Booster Station, etc as the design can be adapted to meet your requirement


MAIN PARAMETER

  General 
  Electric system   
  TypeLD12000IP  

  ABB electric system
  Very guaranteed the quality and operation of the whole dredger for long time.
  Have 30kw extra emergency generator set supply emergency power consumption.

  Function Sand mining and maintenance dredging    Hydraulic system: Germany Rexroth hydraulic parts
  Dredging Features

   Driven: Cutter header, Ladder winch, Two side winches, Two spud rams.Two hydraulic pumps, hydraulic valves. Extra Emergency pump can drive all hydraulic parts use emergency generator set driven.

  Standard dredging depth (m)20m    Cutter
  Principal characteristics  Size2500mm  
  Overall length (m)  49m
  Rotation speed25rpm  
  Breadth (m)  9.4m  Winches
   Draft (m)  1.8m  Ladder winch1unit  
  Discharge distance (m)  2000m  Swing winches2units  
 Dredge pump: Australia Technology Pump  All winches driven by independent hydraulic system.
  Mixture capacity(approx)12000m³/h   Spuds
  Engine(Cummins or CAT)  Length31m  
Total  engine power(Cummins)2731kw (3714HP)  

  Deck crane
   Include  Features



  Supplying all necessary tools for
  connecting/disconnecting the pontoons
  cutter ladder
  maintenance of dredge pump and engine
  Toilet
  Kitchen
  Deck crane
  Fire fighting apparatus
  Life buoy and life jackets
  Accommodation room

  Easily assembly and dismantling
  Transported by road, rail or sea
  One man operation
  With advanced hydraulic system
  Water cooled diesel engines
  Advanced professional design
  Spare parts available
  Completely tested before delivery
  Operators cabin and living room with
  Air conditioning
  Depend on working condition can
  Customize the suitable dredger

  Fuel consumption(approx)≤382kg/ hr    Production time180--220 working day  
  Extra emergency generator set45kw    LoadingTransported by truck to seaport then export by bulk vessel.  


MAIN PARTS

1527738107514430.jpg


Compare With Other Dredger In The Entire Series

DOWNLOADS

RELATED PRODUCTS

CONTACT

Feedback